With the rush to go electric, the AA has warned that the National Grid will have trouble coping with the demand of the electric cabs ‘plug- in’. A report by the National Grid concluded that another 30 gigawatts would be needed to power all future electric vehicles. That’s almost 10 times the total power output of nuclear power station Hinckley Point C now under construction after decades of debate regarding the advisability having it built.
